© Architecture Plus - Interior Design - Fort Smith, AR

BUTTERFIELD ASSEMBLY OF GOD

This 750 seat Sanctuary addition includes 200 seats on precast concrete cascade seating. The remodeling includes an elevator for handicapped access to the second floor and complete removal and replacement of all existing wall for the new classroom layout. The project includes a new fire sprinkler system throughout both the addition and existing building, as well as being designed for future additions to the east and south sides of the building. The Sanctuary stage has the capacity for 80 singers or performers and is elevated three feet to allow good sight lines for all parishioners.